Projects
In progress projects
In progress projects

Start fabrication : By End of year 2008
  • Electrical Rig ,VFD system
  • MAST 170 ft clear height
  • Rotary table 49 ½ ”
  • TDS -8SA top drive system
  • Drawworks power: 4600 HP.
  • Operating water depth: 400 ft (122 m)
  • Drilling depth: 30000 ft (9,144 m).
  • Quarters capacity: 120 persons.
  • 3 -Mud pumps 2200 HP.
  • Power system of 5 Cat Engines ( 3516B) & 1 Emergency Cat Engine (3512).
  • Three pedestal cranes with 120 ft (36.6 m) boom.
  • Horizontal & vertical pipe handling systems.
  • Three lifeboats (60 person each).
  • Four life rafts (35 persons each).
  • Cascading shaker system & 1 vacuum degasser.
  • Storage of 4,720 bbls fuel oil.
  • Storage of 10,540 bbls drill water.
  • Storage of 2,180 bbls potable water.
  • Storage of 15,800 tons preload ballast.
  • Storage of 17,400 cu.m bulk mud/cement.
  • Storage of 3,960 bbls active & reserve pits.
  • 5000 sack storage.
  • In progress Project.JPG

    Badr yard
    Badr yard.JPG Badr yard.JPG Badr yard.JPG
    Badr yard is one of the expansion projects that our company is looking forward to complete as soon as possible. Badr yard will play a very big role for the engineering department which will deduct the outsourcing and hiring cost of workshops to make overhauls in.
    Equipment overhaul
    Equipment overhaul Complete overhaul for the Power Tong
    ST#1,9 ST#2
    ST NO 1 - 9.JPG ST NO 2.JPG
    Top end overhaul for the shanDong power engine.
    Complete overhaul for the shanDong power engine.
    Complete overhaul for the Air hoist 5 ton
    ST#5,7 ST#10
    ST NO 5 - 7.JPG ST NO 10.JPG
    Complete overhaul for the Crown Block
    ST#1,21
    ST NO 1-21.JPG ST NO 1-21 _.JPG
    Complete overhaul for Mud Pump
    Top Drive & new equipment installation
    1-Top Drive

    Reasons to use Top Drive over classical drilling equipment

    Top Drive - new equipment installation.JPG
    So we Install the Top Drive on the following Rigs:
    (Varco TDS-11SA) ST#1,3,4,5,6,8,12 (Tesco ECI900 ) ST#9,10,11
    Varco -TDS-11SA.JPG Tesco- ECI900.JPG

    2-New installed equipments
    Install H2S -  LEL system on all rigs.JPG Man Rider Installation for all rigs.JPG Install new alarm panels for main engines.JPG
    Install H2S & LEL system on all rigs Man Rider Installation for all rigs  Install new alarm panels for main engines
    Install Fuel Purifier on all rigs.JPG Install SCR CO2 fire fighting system on all rigs.JPG Isolate all engines exhaust pipe manifolds.JPG
    Install Fuel Purifier on all rigs Install SCR CO2 fire fighting system on all rigs Isolate all engines exhaust pipe manifolds
    New rigs & Refurbishing old rigs

    Sinotharwa Rigs
    Rig up project for the following rigs:
    Rig ..……………………………………..Start operation
    ST# 1 (2000 HP)…………………………January,2006
    ST# 2 (1500 HP)…………………………January,2006
    ST# 3 (2000 HP)…………………………January, 2007
    ST# 4 (2000 HP)…………………………September,2007
    ST# 5 (1500 HP)…………………………April ,2008
    ST# 6 (1500 HP)…………………………End of April ,2008
    ST# 7 (1000 HP)…………………………July ,2008
    ST# 8 (1500 HP)…………………………June,2008
    ST# 9 (2000 HP………………………….March, 2008
    ST# 10 (1500 HP)………………………..End of June,2008
    ST# 11 (2000 HP)………………………..End of Oct.,2008
    ST# 12 (2000 HP)………………………..Febrauary,2009
    ST# 21 (650 HP-work over)…………….. January, 2007
    ST# 22 (650 HP-work over)……………. .November ,2007
    ST#23 (650 HP-work over)………………End of March ,2008
    ST#24 (650 HP-work over)………………End of August,2008

    Rigs Refurbishing
    St1 Refurbished , April 2007
    St1 Refurbished - April 2007.JPG St1 Refurbished 2 - April 2007.JPG
    Upgrade the rig (Mast, substructure sandblast including MPI)
    St1 Refurbished 3- April 2007.JPG St1 Refurbished 4- April 2007.JPG
    Mud System modification & upgrading upon the operator needs & operation demands
    St2 Refurbished , December 2007
    St2 Refurbished -December 2007.JPG St2 Refurbished 2 -December 2007.JPG

    Modify the Rigs (Mast, sub base sandblast steel fabrications, renew rig floor including MPI

    St2 Refurbished  3 -December 2007.JPG St2 Refurbished  4 -December 2007.JPG

    Fabricated high pressure mud pump lines & standard standpipe manifold

    Projects

    Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements and goals easily and according to the global standards and specially API standards and in time although the time provided to it is limited and critical. 

    Why we start any project?
     
    There are many points that could lead to start a project

    1. The company's expansion, by starting up a new rig.
    2. The company's equipment upgrading, by installing a new equipment.
    3. Modification done to simplify and assist the operation of the rig and make it comply with the global standards, especially API standard.
    4. Problems facing operation or maintenance crew due to breakdowns

    Project planning
    Engineering department does believe that project planning is the key to succeed any project; projects can run on time and interact effectively with both operators and suppliers. Everyone involved understands what is wanted and emerging problems are foreseen (and dealt with) long before they cause damage.

    Projects done

    1. New rigs & Refurbishing old rigs.
    2. Top Drive & new equipment installation.
    3. Equipment overhaul.
    4. In progress projects.

    1.Sinotharwa Rigs
    Rig up project for the following rigs:  
    Rig ..……………………………………….......... start operation
    ST# 1 (2000 HP)…………………………………January,2006
    ST# 2 (1500 HP)…………………………............January,2006
    ST# 3 (2000 HP)…………………………………January, 2007
    ST# 4 (2000 HP)…………………………………September,2007     
    ST# 5   (1500 HP)………………………………..April ,2008
    ST# 6   (1500 HP)………………………………..End of April ,2008
    ST# 7   (1000 HP)………………………………..July ,2008
    ST# 8   (1500 HP)………………………………..June,2008
    ST# 9   (2000 HP…………………………...........March, 2008
    ST# 10 (1500 HP)………………………..............End of June,2008
    ST# 11 (2000 HP)………………………..............End of Oct.,2008
    ST# 12 (2000 HP)………………………………..Febrauary,2009
    ST# 21 (650 HP-work over)………………...........January, 2007
    ST# 22 (650 HP-work over)………………...........November ,2007
    ST#23  (650 HP-work over)………………...........End of March ,2008
    ST#24  (650 HP-work over)………………...........End of August,2008 

    Projects
    Tharwa Petroleum Co. A real Egyption Fortune

    Being characterized as the first Egyptian company to carry out upstream activities in the Egyptian market as well as offering petroleum services, Tharwa has kept its outstanding record of achievements since its inauguration in 2004. With the target of competing in the international arena, Atef Abd El Sadek, Tharwa’s Chairman and Managing Director shares its 2007 future plans with Egypt Oil and Gas Newspaper and shed light on its story of success.

    Tharwa was established as a joint stock company on February 2004, it is the first Egyptian Petroleum Company to excite upstream operations with two main goals; E & P and Petroleum Services. The company’s mission is to explore, develop and produce oil and gas domestically within Egypt, regionally and all over the international arena. The company was established at an appropriate time when oil prices were hitting great hikes and Egypt was seeking to increase its oil revenues.

    Tharwa
    's establishment falls within the framework of a comprehensive ministry program to raise revenues from foreign currencies. Could you briefly describe the activities of your company to our readers? which do not have resources locally to execute their work plans and commitment in Exploration activities in Egypt, but also to those companies having aggressive plans. Also, Tharwa has achieved a sizeable profit for the second fiscal year. Concerning, our upcoming future plans; we have dedicated the year 2007 as the year of the first production from our Western Desert Concessions and 2008 as the year of our first production from Mediterranean Sea Concession “Thekah”.

    Our concern, as well, is competing in the international arena. We already take the step to mark out all the bid rounds in Africa and Asia, and have evaluated our chances in order to be ready in the appropriate time. long and not easy. Studies on technical aspects, economics, feasibility and legislation should be prearranged carefully.